Time-Cost Relationship in Road and Highway Construction

Download Paper |

Conference

2016 ASEE Annual Conference & Exposition

Location

New Orleans, Louisiana

Publication Date

June 26, 2016

Start Date

June 26, 2016

End Date

June 29, 2016

ISBN

978-0-692-68565-5

ISSN

2153-5965

Conference Session

Construction Division Poster Session

Tagged Division

Construction

Tagged Topic

Diversity

Page Count

9

DOI

10.18260/p.27044

Permanent URL

https://peer.asee.org/27044

Download Count

1643

Request a correction

Paper Authors

biography

Ifte Choudhury Texas A&M University

visit author page

Ifte Choudhury is an Associate Professor in the Department of Construction Science at Texas A&M University and has extensive experience as a consulting architect working on projects funded by the World Bank. His areas of emphasis include housing, alternative technology, issues related to international construction, and construction education. He is also a Fulbright scholar.

visit author page

Download Paper |

Abstract

Time-Cost relationship has been found to be valid for different construction types by many researchers. The purpose of this study is to validate this relationship, based on a model developed by Bromilow et al., for highway construction in Florida. Along with time and cost factors, the modified model included contract types to determine whether this variable also has an effect on project duration. Data related to 235 roads and highways construction projects was obtained for the study. SPSS® program was used for analysis of the data. The statistical technique used for the analysis was multiple regression. The results indicate that both actual construction cost and contract type have got a statistically significant relationship with construction time for highway construction projects, at the level of significance (p-value) of <0.0001. A prediction model of construction time has been developed based on the results of the study. This model will be useful to both graduate and undergraduate students taking courses related to cost estimating and construction project scheduling, and also to professionals involved with the construction industry.

Choudhury, I. (2016, June), Time-Cost Relationship in Road and Highway Construction Paper presented at 2016 ASEE Annual Conference & Exposition, New Orleans, Louisiana. 10.18260/p.27044

ASEE holds the copyright on this document. It may be read by the public free of charge. Authors may archive their work on personal websites or in institutional repositories with the following citation: © 2016 American Society for Engineering Education. Other scholars may excerpt or quote from these materials with the same citation. When excerpting or quoting from Conference Proceedings, authors should, in addition to noting the ASEE copyright, list all the original authors and their institutions and name the host city of the conference. - Last updated April 1, 2015