Asee peer logo

The Construction Management Delivery System

Download Paper |

Conference

2000 Annual Conference

Location

St. Louis, Missouri

Publication Date

June 18, 2000

Start Date

June 18, 2000

End Date

June 21, 2000

ISSN

2153-5965

Page Count

6

Page Numbers

5.613.1 - 5.613.6

DOI

10.18260/1-2--8235

Permanent URL

https://peer.asee.org/8235

Download Count

5569

Paper Authors

author page

Daniel Davis

Download Paper |

Abstract
NOTE: The first page of text has been automatically extracted and included below in lieu of an abstract

Session 1421

The Construction Management Delivery System An Architect’s Point of View

Daniel Davis, AIA University of Hartford

Abstract

There are at least three different building project delivery systems in use today. This paper will support the premise that the Construction Management method is the preferred approach for many projects. Construction Management is a building project delivery system that uses the services of a professional manager, who in essence becomes the third member of the traditional Owner/Architect team. The Construction Manager works with the Owner and the Architect in coordinating the entire project, utilizing specialized skills and knowledge to bring a project in on time and on budget, all while maintaining the highest quality. This happens by adding construction expertise and by enhancing services in the pre-construction phases of the project: budgeting, value engineering, constructability reviews, scheduling, and phasing. This process will ensure that the project (1) meets the approved schedule, (2) meets all construction deadlines, and (3) is feasible concerning phased occupancy. When it comes time to build, the Construction Manger is totally familiar with the project and will manage the bidding, awarding and construction phases of the project. I have worked on more than ten (10) different projects that have used the Construction Management method and this can endorse this approach.

What are the three different building project delivery systems?

There are at least three different building project delivery systems in use today: (1) the General Construction model, (2) Design/Build model, and (3) the Construction Management model.

General Construction (GC) • Architect provides all pre-construction services alone. • Builder often determined by low bid. • Owner hires a Clerk or Construction Administrator to observe construction. • Owner has little control over the builder. • My experience with GC includes: Southwest Elementary School, Torrington, CT 20,000 SF addition and 30,000 SF renovation, to be completed Fall 2000.

Davis, D. (2000, June), The Construction Management Delivery System Paper presented at 2000 Annual Conference, St. Louis, Missouri. 10.18260/1-2--8235

ASEE holds the copyright on this document. It may be read by the public free of charge. Authors may archive their work on personal websites or in institutional repositories with the following citation: © 2000 American Society for Engineering Education. Other scholars may excerpt or quote from these materials with the same citation. When excerpting or quoting from Conference Proceedings, authors should, in addition to noting the ASEE copyright, list all the original authors and their institutions and name the host city of the conference. - Last updated April 1, 2015