- Conference Session
- Project-Based Experiences in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
Ahmed Cherif Megri, North Carolina A&T State University
- Tagged Divisions
-
Architectural
project's energy efficiency strategy, requiring daylighting in allperimeter occupied zones, glare mitigation strategies, automatic, continuous dimming, andcommissioning. Advanced controls strategies are also considered. This collaborativeenvironment was realized through coupled daylight and energy simulation, using simulatingrepresentative spaces in the Sensor Placement Optimization Tool (SPOT), a Radiance basedsoftware. Several design variations were considered and an optimum set was settled upon.A light louver system was added to the daylight glazing to bounce the light up the ceiling andeven deeper into the building's interior. Further, light reflectances were chosen for the interiorsurfaces. When coupled with low partition heights, this
- Conference Session
- BIM in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
Christopher Monson, University of Washington; Hoda - Homayouni, University of Washington; Carrie S Dossick, University of Washington; Anne K Anderson, Washington State University
- Tagged Divisions
-
Architectural
were lost in the busy work of figuring out what button to click next in thetutorial sequence.Seeing that the sequence of tutorials and homework was proving to be problematic, the “flip theclassroom” movement offered a potential to improve the instructional design of the lab portion ofthe course. The flip the classroom philosophy has students watch lectures at home and then doactive exercises during class time where faculty expertise can be leveraged to help guide studentsthrough problems or offer reflective critique of their work in progress. This instructional methodcaptured our attention as a means of improving the BIM labs and moving away from the in-classtutorial-based lab sessions. We would flip the labs: have the students do the
- Conference Session
- BIM in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
Stan Guidera, Bowling Green State University
- Tagged Divisions
-
Architectural
context of BIM, it is used to describe a model that has its components displayed sequentially in “screen shots” to reflect the order in which these components will be assembled during the construction process. Such a model can be utilized to study alternative sequences, erection coordination and actual progress. Direct ties to scheduling software can be made, connecting scheduling activities to model components to “drive” the model. 5D: Five-dimensional. The “fifth dimension” generally describes quantity and cost information that is derived from or applied to a BIM model. Current software allows many quantities to be generated directly from a 3D model. Other quantities can be generated
- Conference Session
- Educational Strategies in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
James B Guthrie P.E., California Polytechnic State University
- Tagged Divisions
-
Architectural
included tall building,long span and cantilever systems, foundations and the structural aspects in the design anddetailing of cladding.The catalog description and learning outcomes presented below reflect these two goals. ARCE 316 – Structural Integration in Architecture Catalog Description: Integration of structural systems into architectural design. Preliminary design of structures including the development of gravity load carrying systems and lateral load resisting systems. Introduction to tall building and long span structural systems. Introduction to cladding systems. Taken concurrently with third year architectural studios. Learning Outcomes: Upon
- Conference Session
- Educational Strategies in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
Shahnaz J. Aly, Western Kentucky University
- Tagged Divisions
-
Architectural
are introduced to relevant zoning regulations andbuilding codes. Following this they determine construction type and appropriate structure for thefacility. The project then moves into design development/ construction drawings during whichstudents create site improvement plans, floor plans and reflected ceiling plans, flooring plans,elevations, sections, details (stairs, elevator and washroom), schedules, code compliancedrawings and a cover sheet. The construction drawings contain appropriate room sizes, corridorand stair widths, door sizes, wall types, structural elements, annotation among otherrequirements. Figure 1 & 2 show examples of student work created in AMS 363. Figure 1: Construction Drawings of floor
- Conference Session
- BIM in Architectural Engineering
- Collection
- 2015 ASEE Annual Conference & Exposition
- Authors
-
Wei Wu, California State University, Fresno; Ishan Kaushik
- Tagged Divisions
-
Architectural
Some design Considerable Good design ProfessionalDesign and random, no criteria design logic logic with space layoutSpace Layout logic or reflected, with a few clearly and design reasoning for have basic good identified concept space layout at layout of designation space all space of space functions functionsAnnotation Little to none Very few Some Quite Comprehensiveof Design annotation annotation annotation complete and accurate was made