Mohammad Ilbeigi is an Assistant Professor in the Department of Civil, Environmental, and Ocean Engineering at Stevens Institute of Technology in Hoboken, New Jersey. He received his Ph.D. in Construction Management and an M.Sc. in Computational Science and Engineering from the Georgia Institute of Technology in 2017.
Associate Proffessor in the Department of Engineering Education at Virginia Tech.
This is a work-in-progress paper to share the latest outcomes of an ongoing research project focused on developing and assessing the effectiveness of a novel approach for construction engineering education based on guided active exploration in a digital game environment. The objective of this study is to assess the effectiveness of guided active exploration in a digital game environment on students’ ability to discover systematic solutions for fundamental engineering problems contextualized in domain-specific settings. To address this objective, we are designing and developing an online game, called Zebel: Genesis. The game coupled with a series of pre- and post-assessment tools will be used as learning materials in a graduate-level construction scheduling course in the Department of Civil, Environmental, and Ocean Engineering (CEOE) at Stevens Institute of Technology to collect empirical evidence for qualitative and quantitative analyses. The design of the game is based on the Constructivism learning theory. The Constructivism learning framework for gamification that forms the foundation of our game platform consists of six essential elements: (1) modeling; (2) reflection; (3) strategy formation; (4) scaffolded exploration; (5) debriefing; and (6) articulation. The final game will have three chapters: (i) linear scheduling, (ii) task dependencies and critical path, and (iii) equipment planning and resource management. So far, we have developed the preliminary version of the first two chapters, and we will use it for a pilot study to examine the functionality of the game and assessment tools. This work-in-progress paper presents the game platform, our assessment strategy, and implementation plans.
Ilbeigi, M., & Bairaktarova, D. (2022, August), Work-in-progress: A gamified pedagogical system for teaching construction scheduling through active exploration Paper presented at 2022 ASEE Annual Conference & Exposition, Minneapolis, MN. 10.18260/1-2--41011
ASEE holds the copyright on this document. It may be read by the public free of charge. Authors may archive their work on personal websites or in institutional repositories with the following citation: © 2022 American Society for Engineering Education. Other scholars may excerpt or quote from these materials with the same citation. When excerpting or quoting from Conference Proceedings, authors should, in addition to noting the ASEE copyright, list all the original authors and their institutions and name the host city of the conference. - Last updated April 1, 2015